The first phase, which was primarily about making the decision to use nuclear power and meeting all the 19 infrastructural needs outlined by the International Atomic Energy Agency (IAEA), was fully addressed by the country as at April 2017.
The second phase, which includes implementation of the decisions made in phase one, is said to be progressing steadily, although it was yet to be fully activated.
The Deputy Director, Nuclear and Alternative Energy at Ministry of Energy, Dr Robert Bright Mawuko Sogbadji, made this known during an interaction with selected journalists in Accra on September 18 under the auspices of the Russian State Atomic Energy Corporation (Rosatom). Read Full Story
Facebook
Twitter
Pinterest
Instagram
Google+
YouTube
LinkedIn
RSS