In line with its Emergency Preparedness Plan created in May 2023 to provide relief to communities affected by the controlled spill of the Akosombo and Kpong Dams, the Volta River Authority (VRA) has restored the water supply system for the people of Aveyime in the North Tongu District.
The flooded township’s raw water intake pumps have been relocated to higher ground, and a pump protection shed with power panels has been constructed and connected to the water treatment system. Working around the clock, VRA’s team dug trenches and installed pipes to provide an immediate supply of potable water to the community.
The Deputy Chief Executive (Services) Ken Arthur will hand over the newly commissioned water system to the people of Aveyime.
This will ensure access to clean potable water for drinking, cooking, and bathing. VRA has stated that it is committed to ensuring that the affected communities receive as much relief as possible and to making life easier for the flood victims.
This water supply restoration is the first of many to be carried out in the safe havens. There are plans to expand and provide water to every man, woman, and child in the affected communities.
In areas with shut-off water supply, VRA sends tankers of clean potable water on a daily basis. In addition, they also provide thousands of bags of sachet water for drinking.
The focus on quick, clean water supply by VRA is to help curb the spread of waterborne diseases in the communities. Water is constantly supplied to the flood victims to ensure that such a basic human need is addressed.
Although VRA continues to provide medicine supplies, canned food, toiletries, drugs, mattresses, buckets, rice, sugar, mosquito nets, etc. to the flood victims, it has also taken it upon itself to provide technical relief as well to the communities affected by the controlled spill.
As a company of engineers, VRA aims to go beyond just the supply of relief items and drugs to help the flood victims. VRA is thereby extending its world-class technical competencies to the people in these communities.
VRA is proactively providing relief solutions for the flood victims because they have made a promise to the people to leave no one behind. They vow to stand by this promise.
The post Akosombo dam spillage: VRA restores water supply system in Aveyime appeared first on Citinewsroom - Comprehensive News in Ghana.
Read Full Story
Facebook
Twitter
Pinterest
Instagram
Google+
YouTube
LinkedIn
RSS